Mercandin's Gardens, Klatovy

Display info

The “backbone” of the park is a big stream, which could be crossed by four new footbridges for pedestrians and cyclists – two made of monolithic concrete, two concrete footbridges with a wooden bridge deck. The water surface could be reached by a so-called water steps. The pathway network and lighting are completely new. The construction also involves three new playgrounds and a fitness trail. Furthermore, in the southern part of the area, a new so-called “Treetop Walkway” was placed, which offers exercising in the rope barriers. It is a suspended pathway which is placed on trees between two wooden towers.

Location:
Klatovy
Studies:
2012-2015
Project:
2017
Completion:
2018-2019
Author:
Jakub Chvojka
Construction:
Roman Šafář
Graphics:
Euroverlag, Plzeň
Budget:
40 mil. Kč
Photo:
Ondra Vala